Two weeks on the bay

September 2013

When the Glyn Hopkins Nissan Dealership for Davlyn Construction in Bedford asked Respol to upgrade their Workshop and MOT Bay, Respol knew that they would need to motor on with the work involved to cover the 504 sq m area.

Respol prepared and installed Reegrip El004 low-slip to the Workshop and then prepared and installed P2000 to form a level floor within the MOT Bay area.  Although a big job, Respol still managed to complete the work required within two weeks whilst still ensuring that the necessary Ministry standards were met.

Back to news