Industrial flooring solutions from Santa’s little helpers!

December 2010

Working over the Christmas shutdown period we completed another three industrial flooring projects at Bosch Thermotechnology’s Worcester site.

The entrance from the factory to the staff ‘smoking area’ required the removal of all vinyl sheeting and plastic coving, a complete diamond grind to the whole area and then a prime and overlay of our Reeflor EL002SF.

Moving inside, we were contracted to refurbish their main ‘Track 1’. Chemical preparation of the main floor area gave way to diamond grinding the bare concrete, patch repairs to bolt holes where tracks had been removed and finally, overlay with two coats of our Reecote EC017.

To complete our festive break in Worcester we completed work on their Supermarket Warehouse Project, upgrading the storage area, Goods in Section and gangway areas.

Shotblasting all of the areas to remove existing paint, we then completed the job by overlaying with our own Reeflor EL002SF and were home in plenty of time for the new year!