Exceeding Expectations

May 2009

When customers tell you that the “final result is far better than their expectations” it makes the job all the more satisfying.

Working for Telford Town Shopping Centre, Respol were tasked with refurbishing the main shopping arcade area leading to the bus terminal and main toilet block. Due to problematic tiles, general deterioration and lack of slip resistance, Respol prepared and overlayed the entire area with REETOP CQ3000.

Completed over a period of 4 weeks in two shifts, the work allowed for continual access for shoppers, keeping all areas pedestrian-friendly and within health and safety regulations.

Back to news