Bank holiday factory flooring ensure minimum disruption.

May 2011

McKechnie Plastic Components contracted Respol to lay a factory flooring system and lines to a new substrate base.

Over a seven day period that included the bank holiday, we chemically prepared the area, supplied and installed our Reecote EC017 flooring system incorporating Aluminium Oxide aggregate to the standard McKechnie colour combinations and finished the job with yellow lines applied as required.

Back to news