No chance to relax on the beach!

April 2013

Working over two extended four day bank holidays during Easter and May Day, Respol upgraded the whole of the Senior Glass factory floor in Scarborough. The leading manufacturer of window, door and curtain wall systems called Respol in over the holidays to minimise disruption to their intensive manufacturing programme. The floor was prepared, patched and […]

Read more

News

Pressure on for Easter parade!

April 2013

Working over the Easter shutdown for UYT, a joint venture between the Japanese and the British established in 1996, Respol’s task was to upgrade all pedestrian walkways and lines for the automotive component manufacturer. 1,234 square metres of walkway had to be shot blasted, diamond ground, patch repaired where necessary and then mapped out and […]

Read more

News

MaxPack acquaintance renewed!

April 2013

Having completed work on their original unit back in 2011, Respol were called back by this Shrewsbury-based supplier of packing products and customised supply solutions, to improve an additional building and make it suitable for warehousing. The 926 square metre area was shot blasted and a considerable amount of patching was then required. Two coats […]

Read more

News