No time for a break!

October 2008

Having installed two sample areas back in January, Respol were asked to carry out the proposed flooring upgrades at Ringtons in Newcastle upon Tyne, the oldest UK importers of Tea. Upgrading the main production gangways to improve slip resistance was the main remit due to slip problems being encountered from the tea dust. Carried out […]

Read more

News

Refurbish & Resist

October 2008

Developers and manufacturers of Market leading advanced chemical biosecurity products, Medichem International contracted Respol to refurbish their production facility over a week-long period. Installing new falls to new drains and coating in Polymer P1200, the whole of the floor area was then overlaid with Reegrip Chemical Resistant.

Read more

News

Keeping the CAT purring

October 2008

Over a period of seventeen days including weekends, Respol carried out some major refurbishments, as it’s third contract for Caterpillar Logistics (UK), the main parts distribution centre in Europe for Caterpillar spares. With improving the main gangways around the entire factory and clearly defining pedestrian walkways the main brief, Respol’s work in the ‘Picking Area’ […]

Read more

News